Laboratory and Research Facilities
 
Chemistry Facility sketch

 

 

 





Key Mosaic personnel and our consultants have in-depth knowledge of and are experienced in all aspects of the unique design requirements for laboratory research facilities including architectural, mechanical and electrical systems. The majority have substantial experience in designing and managing Los Alamos National Laboratory projects.

  • FOCI certified
  • familiar with most LANL Techincal Areas
  • helped develop AutoCAD standards for LANL Drafting Manual
  • ISO 9000 based QA Plan in place
  • completed over 25 Design/Build projects,
    examples include:

Center for Integrated Nanotechnologies, CINT Gateway to Los Alamos
MST Division, TA-3, LANL and SNL
project information >>>

LANL Modular Mobile Nuclear Facility (an ML1 Project)
TRU-Waste Transportainer
project information >>>

Los Alamos Research Park
Tenant Improvements of LANL leased space
project information >>>

MST Office Building
MST Division, TA-3, LANL
project information >>>

Shock and Detonation Physics Facility
DX Division, TA-22, LANL
project information >>>

BWTX Pantex, Deferred Maintenance
Pantex DOE Facility for High Explosives, Amarillo, TX
Deferred maintenance analysis, cost estimating, evaluation for historic preservation, and recommendation of materials replacement for 30,000 sf, historically significant buildings

Primary contractor: Omicron

Center for Stockpile Stewardship Research Facility, CSSR
P, X, and CCS Divisions, TA-3, LANL
Mosaic developed and produced a Facility Research Document that analyzed existing conditions and spatial constraints to generate interest in funding new facilities for the division and to be used as a new baseline for the F&ORs.

Primary Contractor:
TMC, Los Alamos, NM

Health Safety and Radiation Protection Facility Research
HSR Division, TA-3, LANL
Developed and produced a Facility Research Document that analyzed existing conditions and spatial constraints to generate interest in funding new facilites for the division and to be used as a baseline for the F&ORs

Primary contractor: TMC Inc, Los Alamos, NM

Beryllium Tech Facility, Filter Bank Addition
MST Division, TA-3, LANL
Assisted in development of the Design Criteria to house a filter bank.

Primary Contractor: Merrick and Co, Los Alamos, NM

RedNet VTRs
LANL
An on-going, lab-wide project - develop and produce the F&ORs and Design Criteria for VTRs to contain RedNet equipment, attend and document weekly project team meetings, perform design reviews

Primary Contractors: TMC, Los Alamos, NM; Parsons Brinckerhoff, Los Alamos, NM

TA22 Master Plan
DX Division, LANL
LANL Assistance to TDI Inc. to develop F&ORs, conceptual cost estimates, construction phasing and site planning

Primary Contractor: TDI Inc. Los Alamos, NM


<<< top of page
<<< portfolio